One hundred percent of tree material removed during the preconstruction activity was recycled or salvaged by Green Waste Recycle Yard in Richmond, California.
More than 50 native plant species, for a total of 45,000 plants, were collected in the Presidio prior to construction and are now being grown in the Presidio Nursery.
Many of the piles for the high viaduct will be 12 feet in diameter, requiring a special oscillator rig for installation of the piles. Larger, deeper piles mean fewer piles are necessary, opening views from the Presidio to the bay.
The new parkway will allow pedestrians and bicyclists to cross over or under Doyle Drive in accordance with the Presidio Trails and Bikeways Master Plan.
The new parkway will have larger 11- and 12-foot lanes to accommodate buses and provide an improved experience for drivers.
Each weekday, nearly 120,000 vehicles travel between Marin and San Francisco over the Golden Gate Bridge along Doyle Drive.
The start of construction of the Presidio Parkway was accelerated by more than a year thanks to the receipt of $50 million in federal stimulus funding.
The new parkway will improve traffic safety by including continuous shoulders for emergency and disabled vehicles.
The first set of tunnels, the Battery Tunnels, will be constructed north of the San Francisco National Cemetery and span 853 feet.
Halleck Street will be closed and temporarily removed during construction. Upon completion of the Main Post Tunnels, Halleck Street will be restored over the top of the new tunnels.
The Main Post Tunnels will be constructed north of the Main Post parade grounds. These will be the longer of the two sets of tunnels, spanning 1,017 feet.
$3.6 million went directly to small and local businesses for the project’s first preconstruction contract (tree removal and native plant and seed collection).
The new parkway will include extended bus bays on both sides of Richardson Avenue.
Seismic safety will be achieved in 2011 when traffic is transferred onto new structures and the temporary bypass adjacent to the existing facility.
A robust Disadvantaged and Small Business Enterprise Participation Program has been established to actively engage businesses throughout San Francisco, the Bay Area, and California to participate in the project.
The northbound and southbound roadways will be separated by a wide, landscaped median improving driver safety and creating a parkway feel.
Both sets of tunnels will be constructed using the cut and cover method by digging into the natural bluffs and covering the tunnels with a green pedestrian corridor.
Including a temporary bypass in the construction phasing reduced the construction duration by nearly two years.
Concrete is used more than any other man-made material in the world
Search
About the Project
Overview
History
Location
Agency Partners
Project Funding
Environmental Review
Presidio Parkway Features
Overview
Sustainable Design
Safer Roadway
Presidio Access
Enhanced Views
Context Sensitive Design
Architectural Criteria
Before and After Photos
Construction Overview
Overview
Construction Schedule
Construction Hours
Construction Advisory Map
Preconstruction Activities
Project Delivery
Traffic Phasing
Phases During Construction
Long-Term Ramp Closures
Long-Term Local Road Closures
Contractor Yards and Haul Routes
Driver Toolbox
Project Documents
Construction Advisories
Fact Sheets
FEIS/R
Press Releases
Public Meeting Materials
TIGER Documents
Archives
Photo Gallery
Video Gallery
Webcams
Meetings
FAQs
Press Center
Contact Us
Ways to Reach Us
Add Me to the Email List
Report a Construction Issue
For free information about Bay Area Traffic, Transit, Rideshare, or Bicycling.
Go>
Photo Gallery
National Cemetery Historic Fence Installation
June 27, 2012
Gateway to the National Cemetery - Installing the Restored Historic Fence
Download
/ jpg 720 KB
Share Album
Securing the fence
Caltrans photo # 12_10279D_0037
Albums
Browse:
< All >
East End General Construction
Events
High Viaduct Construction
Oscillator Rig
Site Preparation
Southwest Section General Construction
Tunnel Construction
Utility Work
Phase II Site Preparation
(
19 photos
)
Historic Building Deconstruction
(
5 photos
)
National Cemetery Historic Fence Installation
(
11 photos
)
Seismic Safety Celebration, May 4, 2012
(
14 photos
)
Doyle Drive Demolition Weekend
(
26 photos
)
Moveable Median Barrier Installation
(
15 photos
)
Variable Message Sign (VMS) Installation
(
9 photos
)
National Cemetery Historic Fence Restoration
(
10 photos
)
Construction Aerials, February 2012
(
10 photos
)
Foundation for At-Grade Roadway
(
8 photos
)
Battery Tunnel Light Installation
(
9 photos
)
High Viaduct Steel Fins and Railings December 2011
(
7 photos
)
Southbound Battery Tunnel Roof and Utilities
(
17 photos
)
Construction Aerials, November 2011
(
13 photos
)
High Viaduct Steel Fins and Railings
(
10 photos
)
Dragonfly Creek Restoration
(
10 photos
)
Construction Aerials, September 2011
(
11 photos
)
Southbound Battery Tunnel Roof Concrete Pour
(
6 photos
)
Southbound Battery Tunnel Roof Falsework
(
8 photos
)
Temporary Bypass Construction
(
3 photos
)
Substation Construction
(
4 photos
)
Southbound Battery Tunnel Concrete Pours
(
14 photos
)
Concrete Pour for High Viaduct Roadway Deck
(
17 photos
)
Southbound Battery Tunnel Floor and Walls
(
13 photos
)
U.S. DOT Deputy Secretary and Mayor Site Visit
(
11 photos
)
High Viaduct Construction - January 2011
(
10 photos
)
Southbound Battery Tunnel Excavation
(
8 photos
)
High Viaduct Falsework Installation and Construction - ...
(
9 photos
)
Northbound Ruckman Bridge Deck Pour
(
7 photos
)
High Viaduct Steel Fin Installation
(
7 photos
)
Falsework Installation - September 2010
(
14 photos
)
Fleet Week 2010
(
9 photos
)
Southwest Section - Southbound Bridge Falsework
(
10 photos
)
Demolition of Former Public Storage Buildings
(
11 photos
)
Tunnel Groundbreaking, July 2010
(
11 photos
)
Marin County Fair 2010
(
10 photos
)
Oscillator and Bridge Foundations
(
17 photos
)
Bike Event - May 2010
(
8 photos
)
Southwest Section - General Construction
(
15 photos
)
Ruckman Temporary Bridge Construction
(
41 photos
)
Southwest Section - Steel Cages
(
15 photos
)
Palm Tree Relocation
(
35 photos
)
Utility Work 2009
(
14 photos
)
Southwest Section - Lincoln Realignment
(
2 photos
)
Deep Soil Mixing
(
2 photos
)
Contract #4 Pre-Bid Meeting
(
12 photos
)
Manzanita Transplating
(
7 photos
)
Commencement Celebration
(
51 photos
)
Site Preparation Tree Removal Near High Viaduct
(
8 photos
)
Tree Removal During Weekend Ramp Closure: 8/22-23
(
8 photos
)
Native plant and seed collection
(
10 photos
)