<?xml version="1.0" encoding="UTF-8"?>
<?xml-stylesheet href="rss.xsl" type="text/xsl"?>
<rss version="2.0"><channel><title>Presidio Parkway Project Neighbors</title><link>http://www.presidioparkway.org/neighbors/</link><description></description><ttl>5</ttl><item><title>McDowell Ave Night Closures, Beginning May 16</title><link>http://www.presidioparkway.org/neighbors/#mcdowell_ave_night_closures_beginning_may_16_</link><description><![CDATA[<strong>McDowell Avenue will be CLOSED from 9:30 p.m. to 5:30 a.m. the next morning Monday through Friday for approximately two weeks, beginning Thursday, May 16.</strong><br /> <br /> This closure is required as deconstruction of the old High Viaduct continues over McDowell Avenue.&nbsp;The work will include demolishing the steel truss and columns.<br /> <br /> <a href="http://presidioparkway.org/project_docs/files/mcdowellclose_may2013.pdf" target="_blank">See the advisory for a map of detours during McDowell Avenue closures.</a><br /> <br /> <strong>Beginning the week of May 13 and continuing for approximately one month,</strong> <strong>there will be intermittent traffic control on Mason Street and minor parking impacts east of the Sports Basement.</strong> This work is required as part of ongoing utility installation and relocation. Please watch for &ldquo;No Parking&rdquo; signs, detour signs and traffic flaggers.<br /> <br /> <a href="http://presidioparkway.org/project_docs/files/masonutilitywork_may2013.pdf" target="_blank">View the Mason Street advisory for additional information.</a>]]></description><pubDate>Thu, 16 May 2013 13:18:00 PDT</pubDate></item><item><title>Lincoln Blvd Nighttime Closures, May 13 &amp; 14</title><link>http://www.presidioparkway.org/neighbors/#lincoln_blvd_nighttime_closures_may_13__14_</link><description><![CDATA[<div id="_mcePaste" style="position: absolute; left: -10000px; top: 0px; width: 1px; height: 1px; overflow: hidden;">Lincoln Boulevard will be CLOSED from 10:00 p.m. to 5:00 a.m. the next morning on Monday, May 13 and potentially on Tuesday, May 14 from 10:00 p.m. to 2:00 a.m. This closure is required as deconstruction of the old High Viaduct occurs over Lincoln Boulevard.</div><div id="_mcePaste" style="position: absolute; left: -10000px; top: 0px; width: 1px; height: 1px; overflow: hidden;">Work hours will be 9:30 p.m. to 5:30 a.m. The work includes demolishing the roadway deck and removing steel girders.</div><strong>Lincoln Boulevard will be CLOSED from 10:00 p.m. to 5:00 a.m. the next morning on Monday, May 13 and potentially on Tuesday, May 14 from 10:00 p.m. to 2:00 a.m. </strong>This closure is required as deconstruction of the old High Viaduct occurs over Lincoln Boulevard.<br/><br/>Work hours will be 9:30 p.m. to 5:30 a.m. The work includes demolishing the roadway deck and removing steel girders.<br/><br/><div><a href="http://presidioparkway.org/project_docs/files/lincolnclosure_may13_2013.pdf" target="_blank">View the advisory for detour information during the closure.</a></div>]]></description><pubDate>Mon, 13 May 2013 17:59:00 PDT</pubDate></item><item><title>Lincoln Blvd Night Closures, May 6-10</title><link>http://www.presidioparkway.org/neighbors/#lincoln_blvd_night_closures_may_610_</link><description><![CDATA[<div id="_mcePaste" style="position: absolute; left: -10000px; top: 0px; width: 1px; height: 1px; overflow: hidden;">Lincoln Boulevard will be CLOSED from 10:00 p.m. to 5:00 a.m. the next morning from Monday, May 6 through Friday, May 10. This closure is required as deconstruction of the old High Viaduct occurs over Lincoln Boulevard.&nbsp;</div><div id="_mcePaste" style="position: absolute; left: -10000px; top: 0px; width: 1px; height: 1px; overflow: hidden;"><br /></div><div id="_mcePaste" style="position: absolute; left: -10000px; top: 0px; width: 1px; height: 1px; overflow: hidden;">Work hours will be 9:30 p.m. to 5:30 a.m. The work includes demolishing the roadway deck and removing steel girders. The bike path adjacent to Lincoln Boulevard (Presidio Promenade) will also be closed during this time.</div><div><div><strong>Lincoln Boulevard will be CLOSED from 10:00 p.m. to 5:00 a.m. the next morning from Monday, May 6 through Friday, May 10. </strong>This closure is required as deconstruction of the old High Viaduct occurs over Lincoln Boulevard.&nbsp;</div><div><br /></div><div>Work hours will be 9:30 p.m. to 5:30 a.m. The work includes demolishing the roadway deck and removing steel girders. The bike path adjacent to Lincoln Boulevard (Presidio Promenade) will also be closed during this time.</div></div><div><br /></div><div><a href="http://www.presidioparkway.org/project_docs/files/lincolnclosure_may2013.pdf" target="_blank">See the advisory for a map with detour routes.</a></div>]]></description><pubDate>Thu, 02 May 2013 16:14:00 PDT</pubDate></item><item><title>Gorgas Warehouses Parking Area Closed – April 22</title><link>http://www.presidioparkway.org/neighbors/#gorgas_warehouses_parking_area_closed__april_22_</link><description><![CDATA[<div id="_mcePaste" style="position: absolute; left: -10000px; top: 0px; width: 1px; height: 1px; overflow: hidden;">The parking lot behind the Gorgas Warehouses will be closed for underground utility installation. The work includes removing pavement (saw cutting and jackhammering), digging trenches, installing utilities, replacing and compacting soil and paving. This work is expected to last approximately 3 weeks.</div><div id="_mcePaste" style="position: absolute; left: -10000px; top: 0px; width: 1px; height: 1px; overflow: hidden;"><br /></div><div id="_mcePaste" style="position: absolute; left: -10000px; top: 0px; width: 1px; height: 1px; overflow: hidden;">All businesses remain open.Thank you for your patience.</div><strong>The parking lot behind the Gorgas Warehouses will be closed beginning April 22</strong> for underground utility installation. The work includes removing pavement (saw cutting and jackhammering), digging trenches, installing utilities, replacing and compacting soil and paving. This work is expected to last approximately 3 weeks.<br/><br/>All businesses remain open. Thank you for your patience.<br/><br/><a href="http://presidioparkway.org/project_docs/files/gorgasparkingclosure_apr2013.pdf" target="_blank">See the advisory for a map of the closure.</a><br/><br/>]]></description><pubDate>Thu, 18 Apr 2013 14:30:00 PDT</pubDate></item><item><title>McDowell Avenue Night Closures, April 15-19</title><link>http://www.presidioparkway.org/neighbors/#mcdowell_avenue_night_closures_april_1519_</link><description><![CDATA[<div id="_mcePaste" style="position: absolute; left: -10000px; top: 0px; width: 1px; height: 1px; overflow: hidden;">McDowell Avenue will be CLOSED from 9:30 p.m. to 5:30 a.m. the next morning beginning Monday, April 8 through Friday, April 12.&nbsp;</div><div id="_mcePaste" style="position: absolute; left: -10000px; top: 0px; width: 1px; height: 1px; overflow: hidden;"><br /></div><div id="_mcePaste" style="position: absolute; left: -10000px; top: 0px; width: 1px; height: 1px; overflow: hidden;">This closure is required for deconstruction of the old High Viaduct to occur over the roadway.&nbsp;</div><div id="_mcePaste" style="position: absolute; left: -10000px; top: 0px; width: 1px; height: 1px; overflow: hidden;"><br /></div><div id="_mcePaste" style="position: absolute; left: -10000px; top: 0px; width: 1px; height: 1px; overflow: hidden;">The work includes demolishing the roadway deck and removing steel girders.</div><div id="_mcePaste" style="position: absolute; left: -10000px; top: 0px; width: 1px; height: 1px; overflow: hidden;"><br /></div><div id="_mcePaste" style="position: absolute; left: -10000px; top: 0px; width: 1px; height: 1px; overflow: hidden;">View the advisory for additional information.</div><strong>McDowell Avenue will be CLOSED from 9:30 p.m. to 5:30 a.m. the next morning beginning Monday, April 15 through Friday, April 19.&nbsp;</strong><br/><br/>This closure is required for deconstruction of the old High Viaduct to occur over the roadway.&nbsp;<br/><br/>The work includes demolishing the roadway deck and removing steel girders.<br/><br/><a href="http://presidioparkway.org/project_docs/files/mcdowellclose_apr2013_2.pdf" target="_blank">View the advisory for additional information.</a><br/><br/>]]></description><pubDate>Fri, 12 Apr 2013 11:51:00 PDT</pubDate></item><item><title>McDowell Ave Night Closures, April 8-12, 9:30pm - 5:30am</title><link>http://www.presidioparkway.org/neighbors/#mcdowell_ave_night_closures_april_812_930pm__</link><description><![CDATA[<strong>McDowell Avenue will be CLOSED from 9:30 p.m. to 5:30 a.m. the next morning beginning Monday, April 8 through Friday, April 12.</strong> <br /> <br /> This closure is required for deconstruction of the old High Viaduct to occur over the roadway.&nbsp;<br /> <br /> The work includes demolishing the roadway deck and removing steel girders.<br /> <br /> <span style="text-decoration: underline;"><a href="http://www.presidioparkway.org/project_docs/files/mcdowellclose_apr2013.pdf" target="_blank">View the advisory for additional information.</a></span>]]></description><pubDate>Fri, 05 Apr 2013 16:03:00 PDT</pubDate></item><item><title>Temporary Pump Station to be Removed</title><link>http://www.presidioparkway.org/neighbors/#temporary_pump_station_to_be_removed_</link><description><![CDATA[Beginning the week of March 25, the temporary pump station on Lincoln Boulevard will be removed and the sidewalk will be restored. Access from Riley Avenue and the Taylor Road parking area will be from Sheridan Avenue. Work is scheduled to begin at 7 AM. Please follow the direction of flaggers and signage.This work will include pavement and utility removal and requires the use of heavy equipment. Removal of the pump station is expected to last approximately two weeks.]]></description><pubDate>Wed, 27 Mar 2013 11:34:00 PDT</pubDate></item></channel></rss>
