|
Modeling Tool Demonstrating Construction of the Southbound Battery Tunnel and Temporary Bypass
|
|
wmv
/
13.47 MB
|
|
|
|
|
Presidio Parkway Drive-Through of New Roadway
|
|
wmv
/
342.99 MB
|
|
|
|
|
Long-Term Ramp Closures and Initial Construction Activity
|
|
wmv
/
26.83 MB
|
|
|
|
|
Modeling tool demonstrating the first phase of construction process on the western end of the project
|
|
wmv
/
14.23 MB
|
|
|
|
|
Oscillator Rig & Bridge Foundation Construction
|
|
wmv
/
53.16 MB
|
|
|
|
|
Phase 1 Construction: Late 2009 – Late 2011
|
|
wmv
/
85.96 MB
|
|
|
|
|
Rare Manzanita Relocation - Narrated
|
|
wmv
/
34.61 MB
|
|
|
|
|
Presidio Parkway: Flythrough Simulation of New Roadway
|
|
wmv
/
72.17 MB
|
|
|
|
|
Julie Berry Speaking at Presidio Parkway Tunnel Groundbreaking, July 2010
|
|
wmv
/
86.58 MB
|
|
|
|
|
Presidio Parkway Project Overview
|
|
wmv
/
152.87 MB
|
|
|
|
|
Simulation of Ruckman Traffic Shift on Hwy 1, January 2011
|
|
wmv
/
7.17 MB
|
|
|
|
|
Presidio Parkway Construction B-Roll
|
|
mov
/
348.48 MB
|
|
|
|