Skip Navigation

Video Gallery

Phase 1 Construction
February 15, 2012  |  01:36
Late 2009-Spring 2012

Watch construction of the project's first phase which includes the new southbound high viaduct bridge, the southbound Battery Tunnel and a temporary bypass. Upon completion, traffic was transferred onto this seismically safe condition.
View in: Silverlight
+ Share
Browse:     Showing: Top Videos
Timelapse of Low Viaduct Construction Looking East
Timelapse of Low Viaduct Construction Looking East
03:36 | May 16, 2016
Timelapse of Main Post Tunnel Construction Looking West
Timelapse of Main Post Tunnel Construction Looking West
03:36 | May 16, 2016
Timelapse of Main Post Tunnels and Temporary Detour
Timelapse of Main Post Tunnels and Temporary Detour
02:16 | May 16, 2016
Timelapse of the High Viaduct and Battery Tunnel
Timelapse of the High Viaduct and Battery Tunnel
01:46 | May 16, 2016
Tunnel System Testing for Southbound Battery Tunnel, April 2012
Tunnel System Testing for Southbound Battery Tunnel, April 2012
01:06 | May 13, 2015
Temporary Highway 1 and 101 Interchange Alignments, July 2014
Temporary Highway 1 and 101 Interchange Alignments, July 2014
01:36 | Jul 8, 2014
Presidio Parkway - Project Overview
Presidio Parkway - Project Overview
02:40 | Dec 6, 2013
Presidio Parkway
Presidio Parkway
01:57 | Mar 18, 2011
Why Must Doyle Drive Be Replaced?
Why Must Doyle Drive Be Replaced?
00:56 | Jul 15, 2009
 
  © Copyright Presidio Parkway Contact Us  |  Press Center  |  Site Map  |  Neighborhood UpdatesAgency Logos